The Work across the city continues, here are just a few progress updates. E. Broad Street Monday, January 30, 2023 Broad St. between Williams and Sumner will be working between Williams St. and Sumner. They have a flagger on site to keep traffic moving. Please drive safely. Cleveland Street...

read more

STREET SWEEPING – 2022 SECOND ROUND

The second round of the annual City of Elyria Street Sweeping Initiative is scheduled to begin on Monday, September 26, 2022. Sweeping will start in Ward 5 and progress through the rest of the City counterclockwise in the following order: Ward 3 Ward 1 Ward 7 Ward 4 Ward 2 Ward 6 Prior to...

read more

Spring Valley Drainage

The Spring Valley area suffers from the lack of storm sewer infrastructure.  Below are basic information on the subject, PowerPoint presentation from the July 12 meeting, and an overall map and example of a preliminary plan from the 2017-2018 work performed by an outside consultant. Q&A Spring...

read more

Mayor Whitfield Previews Infrastructure Projects

Elyria Mayor Frank Whitfield and the city’s engineering department gathered this week at a town hall meeting to preview upcoming infrastructure projects. The meeting aimed to educate the public about the planned resurfacing projects on East Broad and Cleveland streets through 2024. The town hall...

read more

Downtown TLCI Phase 4 Project to Start Tuesday, September 7, 2021

The 4th phase of the Transportation for Livable Communities Initiative (TLCI) in the downtown area is set to begin on Tuesday, September 7, 2021.  Sidewalks will be replaced at three locations on Broad Street and street lighting at various locations in downtown.   Access to businesses will be...

read more

STREET SWEEPING – 2021 Second Round

The second round of the annual City of Elyria Street Sweeping Initiative is scheduled to begin on Tuesday, September 7, 2021. Sweeping will start in Ward 5 and progress through the rest of the City counterclockwise in the following order: Ward 3 Ward 1 Ward 7 Ward 4 Ward 2 Ward 6 Prior to...

read more

2021 Street Resurfacing Phase 2

The second round of Street Resurfacing projects will begin in August/September. Phase 2 projects include Concord Ave., Lexington Ave., E. Heights Blvd., Kansas Ave., Nebraska Dr., Sandpiper Ave., 13th St., Chestnut St., Parkview Ct., Courtland St., Penfield Ave., Mussey Ave., and Fowl Rd....

read more

2021 Street Resurfacing Phase 1

The first round of Street Resurfacing projects will begin in August/September. Phase 1 projects include Apple St., Beechwood Dr., Belmont Ave., High St., N. Pasadena Ave., Hartford Dr., Huntington Cir./Winthrop Dr., Artemas Ct., Hawthorne St., Howard St., and Hollywood Dr. Alternate streets...

read more

STREET SWEEPING – 2021 First Round

The first round of the annual City of Elyria Street Sweeping Initiative has been POSTPONED UNTIL JUNE 7 DUE TO WEATHER ISSUES. Sweeping will start in Ward 5 and progress through the rest of the City counterclockwise in the following order: Ward 3 Ward 1 Ward 7 Ward 4 Ward 2 Ward 6 Prior to...

read more

Road Closure: W. River – Lake Ave to SR-57

Beginning Monday September 21, 2020, W River Road N between Lake Avenue and Furnace Street will be closed for water main installation, sewer replacement and pavement restoration. Northbound traffic will not be permitted. Local traffic will be able to travel Southbound.  The project will begin on W...

read more

Traffic Update: Broad Street at Cedar Street

Road Closure: On Monday June 15, 2020 at approximately 7:00 AM, The Broad Street and Cedar Street construction project will have a new traffic pattern. Cedar Street will be open and the west side of Broad Street at Cedar Street will be closed. This is part of the TLCI project installing concrete...

read more

Abbe Road Update

Beginning the morning of May 26, 2020: Abbe road will be closed at the intersection of Poplar Street and Abbe Rd. All residents living north of the intersection will have access to their premises from Rt. 57, and all residents living south of the intersection will have access from Cleveland...

read more

Road Construction Updates: Cleveland Street and SR 301

From the ODOT Daily Transportation Traffic Digest: US Route 20: Roadway Improvement Update US 20, at the intersections of Cleveland Street/South Abbe Road and Cleveland Street/SR 57, will have single lane closures as needed as crews continue to work on traffic signal replacements at the two...

read more

Road Closure: Depot St

Road Closure: Depot Street, between Washington Ave. and East Ave. will be closed for maintenance. Completion time undetermined.