The Elyria Planning Commission (or in some cases the Design Review Committee as its representative) considers the following application elements:

  • Building mass and exterior detail relative to adjacent buildings or site features;
  • Materials, texture and color;
  • Landscaping, screening, buffering, fencing, and lighting;
  • Vehicular and pedestrian access;
  • Signage

Meetings are held on the first Tuesday of each month at 11:00 AM in City Hall Council Chambers.

PLANNING COMMISSION DATES

  • January 2nd, 2024
  • February 6th, 2024
  • March 5th, 2024
  • April 2nd, 2024
  • May 7th, 2024
  • June 4th, 2024
  • July 2nd, 2024
  • August 6th, 2024
  • September 3rd. 2024
  • October 1st, 2024
  • November 5th, 2024
  • December 3rd, 2024

PLANNING COMMISSION MEMBERS

  • Chris Pyanowski (Vice-Chairperson)
  • Tom Aden
  • Derrick Tedrow
  • Barry Hubbard
  • Sam Battle
  • Jim Onderko
  • John Hammond (Parks Board Alternate)

PLANNING COMMISSION EX-OFFICIO MEMBERS

  • Darryl Farkas, Chief Building Official
  • Ashley Scott, Director, Office of Community Development
  • John Schneider, City Engineer
  • Chief William Gall, Fire Marshall
  • Mark Craig, Administrative Legal Counsel

PROCEDURES TO APPLY TO PLANNING COMMISSION

  1. Complete the attached application request for Planning Commission Review. Or provide a letter addressed to the Elyria Planning Commission stating what is being requested.
  2. Please provide 16 complete sets; application, drawings, photos, etc.; 4 full original sets (Engineering, Community Development, Fire, Building), and 12 copied sets to the Planning Commission Secretary no later than 15 days prior to the scheduled Planning Commission Meeting.
  3. If a Variance or Conditional Use Permit is being requested, please provide names, addresses and parcel numbers of the adjacent and adjoining property owners of the property and a public notice will be mailed out to those property owners.
  4. If a Re-Zoning request is made, please provide the required legal description, or survey of the area, including size in square footage or acreage, include locations of the areas as to City streets, and numbers or distances from an indicated intersection, etc. A complete list of the specific requirements can be located in the Elyria Codified Ordinance, Section 1133.03 and is available upon request.
  5. A $100 Variance fee is required – made payable to the City of Elyria.
  6. A $500 fee is required to apply for a Conditional Use Permit and a Re-Zoning request.
  7. There is NO fee to request a Waiver to the Design Review Guidelines or for Planning Commission Review. (A list of other fees are listed on the application)
  8. Please provide photographs of the property to show how the Variance, if granted, will affect adjacent properties. Three or four photos of the affected area of construction are sufficient. (Front, rear, sides).
  9. If needed, the Planning Commission Secretary will send out a Legal Notice for the Public Hearing to be published in the Chronicle Telegram 14 days prior to the scheduled meeting.
  10. If you have any questions, please contact Planning Commission Secretary Mary Tomski at 440-326-1486.

DESIGN REVIEW

The purpose of Design Review is to promote safe, functional and attractive development of business and commercial areas. The goals of the process are as follows:

  • to unify commercial properties, both visually and physically, with surrounding land uses
  • to facilitate a more healthful urban atmosphere
  • to protect and preserve the unique and cultural features within the City, and
  • to protect commercial property values by enhancing the City’s appearance

The Design Review process applies to the following activities:

  • NEW CONSTRUCTION – except for 1, 2 and 3 family dwellings
  • EXISTING BUILDING/LANDSCAPES – additions, alterations or renovations to an existing building site or landscape – other than 1, 2 or 3 family building projects – which affect the exterior appearance of a building or site, including but not limited to:
    • new or existing signs
    • color changes
    • parking area modifications
    • site lighting alterations

The Design Review Process does NOT apply to the following activities:

  • Ordinary maintenance or repairs to an existing building or site provided such work involves no change in materials, design, dimensions, texture, color or outer appearance.
  • Interior alterations
  • 1, 2 and 3 family building projects