Select Page

Traffic Advisory

2021 Street Resurfacing Phase 2

The second round of Street Resurfacing projects will begin in August/September. Phase 2 projects include Concord Ave., Lexington Ave., E. Heights Blvd., Kansas Ave., Nebraska Dr., Sandpiper Ave., 13th St., Chestnut St., Parkview Ct., Courtland St., Penfield Ave., Mussey Ave., and Fowl Rd....

read more

2021 Street Resurfacing Phase 1

The first round of Street Resurfacing projects will begin in August/September. Phase 1 projects include Apple St., Beechwood Dr., Belmont Ave., High St., N. Pasadena Ave., Hartford Dr., Huntington Cir./Winthrop Dr., Artemas Ct., Hawthorne St., Howard St., and Hollywood Dr. Alternate streets...

read more

Road Closure: W. River – Lake Ave to SR-57

Beginning Monday September 21, 2020, W River Road N between Lake Avenue and Furnace Street will be closed for water main installation, sewer replacement and pavement restoration. Northbound traffic will not be permitted. Local traffic will be able to travel Southbound.  The project will begin on W...

read more

Street Resurfacing: West River Road

Street resurfacing along West River Road will occur between Infirmary Rd and Turner St. Project is anticipated to begin the week of July 13. Access to all residents and businesses will be maintained throughout construction.

read more

2020 Street Resurfacing Phase 2

The second round of Street Resurfacing projects will begin around July 20. Phase 2 projects include University Ave, 10th St, Chapman Ln, Mussey Ave, Wood St, 7th St, Foster Ave, West River Rd North, Old West Ridge Rd. Alternate streets to be done as determined by bids are Dorset Ct, Elbe St,...

read more

2020 Street Resurfacing Phase 1

The first round of Street Resurfacing projects will begin around July 13. Phase 1 projects include Delaware Ave, Park Ave, Garford Ave, Park Pl, Forest St, Furnace St, Parmely Ave, Bell Ave, Hemlock Dr, Campagna St, Rosealee Ave, Lucille Dr, Livermore Ln, Overbrook Rd, Longfellow St, Roosevelt...

read more

Traffic Update: Broad Street at Cedar Street

Road Closure: On Monday June 15, 2020 at approximately 7:00 AM, The Broad Street and Cedar Street construction project will have a new traffic pattern. Cedar Street will be open and the west side of Broad Street at Cedar Street will be closed. This is part of the TLCI project installing concrete...

read more

Road Construction Updates: Cleveland Street and SR 301

From the ODOT Daily Transportation Traffic Digest: US Route 20: Roadway Improvement Update US 20, at the intersections of Cleveland Street/South Abbe Road and Cleveland Street/SR 57, will have single lane closures as needed as crews continue to work on traffic signal replacements at the two...

read more

Road Closure: Depot St

Road Closure: Depot Street, between Washington Ave. and East Ave. will be closed for maintenance. Completion time undetermined.

read more

Abbe Road Update (East Side Relief Sewer Project)

05/19/2020 – Beginning the morning of 5/26/20: Abbe road will be closed at the intersection of Poplar Street and Abbe Rd. All residents living north of the intersection will have access to their premises from Rt. 57, and all residents living south of the intersection will have access from...

read more