Spring Valley Drainage

The Spring Valley area suffers from the lack of storm sewer infrastructure.  Below are basic information on the subject, PowerPoint presentation from the July 12 meeting, and an overall map and example of a preliminary plan from the 2017-2018 work performed by an outside consultant. Q&A Spring...

read more

Downtown TLCI Phase 4 Project to Start Tuesday, September 7, 2021

The 4th phase of the Transportation for Livable Communities Initiative (TLCI) in the downtown area is set to begin on Tuesday, September 7, 2021.  Sidewalks will be replaced at three locations on Broad Street and street lighting at various locations in downtown.   Access to businesses will be...

read more

STREET SWEEPING – 2021 Second Round

The second round of the annual City of Elyria Street Sweeping Initiative is scheduled to begin on Tuesday, September 7, 2021. Sweeping will start in Ward 5 and progress through the rest of the City counterclockwise in the following order: Ward 3 Ward 1 Ward 7 Ward 4 Ward 2 Ward 6 Prior to...

read more

STREET SWEEPING – 2021 First Round

The first round of the annual City of Elyria Street Sweeping Initiative has been POSTPONED UNTIL JUNE 7 DUE TO WEATHER ISSUES. Sweeping will start in Ward 5 and progress through the rest of the City counterclockwise in the following order: Ward 3 Ward 1 Ward 7 Ward 4 Ward 2 Ward 6 Prior to...

read more

Street Resurfacing: West River Road

Street resurfacing along West River Road will occur between Infirmary Rd and Turner St. Project is anticipated to begin the week of July 13. Access to all residents and businesses will be maintained throughout construction.

read more

2020 Street Resurfacing Phase 2

The second round of Street Resurfacing projects will begin around July 20. Phase 2 projects include University Ave, 10th St, Chapman Ln, Mussey Ave, Wood St, 7th St, Foster Ave, West River Rd North, Old West Ridge Rd. Alternate streets to be done as determined by bids are Dorset Ct, Elbe St,...

read more

2020 Street Resurfacing Phase 1

The first round of Street Resurfacing projects will begin around July 13. Phase 1 projects include Delaware Ave, Park Ave, Garford Ave, Park Pl, Forest St, Furnace St, Parmely Ave, Bell Ave, Hemlock Dr, Campagna St, Rosealee Ave, Lucille Dr, Livermore Ln, Overbrook Rd, Longfellow St, Roosevelt...

read more

Traffic Update: Broad Street at Cedar Street

Road Closure: On Monday June 15, 2020 at approximately 7:00 AM, The Broad Street and Cedar Street construction project will have a new traffic pattern. Cedar Street will be open and the west side of Broad Street at Cedar Street will be closed. This is part of the TLCI project installing concrete...

read more

Road Construction Updates: Cleveland Street and SR 301

From the ODOT Daily Transportation Traffic Digest: US Route 20: Roadway Improvement Update US 20, at the intersections of Cleveland Street/South Abbe Road and Cleveland Street/SR 57, will have single lane closures as needed as crews continue to work on traffic signal replacements at the two...

read more

Abbe Road Update (East Side Relief Sewer Project)

05/19/2020 – Beginning the morning of 5/26/20: Abbe road will be closed at the intersection of Poplar Street and Abbe Rd. All residents living north of the intersection will have access to their premises from Rt. 57, and all residents living south of the intersection will have access from...