Footings
(Prior to pouring concrete)
-
Foundation, Tile & Waterproofing
(Prior to backfilling foundation walls)
-
Underground Heating, Plumbing & Electric rough-ins
(Prior to filling site with stone)
-
Slab
(Prior to pouring concrete)
-
Rough-in on Heating, Plumbing, Electric & Framing
(Prior to insulating structure)
-
Insulation
(Prior to drywall)
-
Final
(Heating, Plumbing, Electric & Construction items are 100% completed)
-
Grading
(Rough grade is established & the rear yard storm drain is installed. Contact the Engineering Dept. for an inspection 440.326.1444