REQUIRED INSPECTIONS:
Please call individual inspectors for scheduling inspections.
1. Footings - Prior to pouring concrete.
2. Foundation, Tile & Waterproofing:
aa-Prior to backfilling foundation walls.
3. Underground Heating, Plumbing & Electric rough-ins
aa- Prior to filling site with stone.
4. Slab- Prior to pouring concrete.
5. Rough- in on Heating, Plumbing, Electric & Framing:
aa- Prior to insulating structure.
6. Insulation
aa- Prior to drywall.
6. Final
aa- Heating, Plumbing, Electric & Construction items are 100% aacompleted.
7. Grading
aa- Rough grade is established & the rearYard storm drain is aainstalled. Contact the Engineering Dept. for an inspection (326-aa1444)